Building Near or Over SA Water Easements in Adelaide: Encroachment Rules and Approval Pathways
When planning a home extension, garage or land division in Adelaide, an underground services easement in the rear or side yard often becomes a key constraint on the site layout. Where a structure, eaves or hard paving cannot avoid the easement, owners and developers generally need to apply to SA Water for approval to encroach over or build over the easement. The assessment involves statutory title restrictions and specific civil engineering protection requirements; it is not just an administrative notification.
Verifying the Easement and Statutory Restrictions: Where Is Construction Prohibited?
At the early design stage, the first step is to obtain the Certificate of Title and its accompanying plan through the South Australian Integrated Land Information System (SAILIS) (a fee applies), and to confirm the nature, width and beneficiary of the easement. Dial Before You Dig (1100) can also be used to identify the location of public utility infrastructure; the detailed position, alignment and depth of SA Water assets must be obtained separately from SA Water (1300 884 037), and owners, occupiers and contractors must not access SA Water’s infrastructure to verify them. According to SA Water’s fact sheet Proposed Encroachment over SA Water Easements and its technical standard, easements are managed on the following basic principles:
No construction over water easements: SA Water states that construction is not permitted over water easements. Encroachment on easements used for water supply or pressurised wastewater is also not permitted, because pressurised mains require the full easement width to be maintained to limit site and structural damage if a main fails under pressure.
No construction over key access points: Construction is not permitted over SA Water’s sewer maintenance holes, maintenance shafts, inspection openings and government inspection points. An unconfined access way of at least 1.0 m wide must be maintained around maintenance structures, with at least 2.4 m of headroom above (TS 0136, section 11.1).
Easements without existing pipes are also restricted: An easement may have been acquired for future works and system growth, and may not contain pipes for some time. Encroachment applications over such easements are assessed by SA Water case by case, and construction without approval is still not permitted.
The types of encroachment SA Water lists as requiring approval include: brick fences, excavation and landfill, sheds, carports, garages, swimming pools or spas, rainwater tanks, tennis courts, concrete paving, residences, timber decking, building eaves, retaining walls and verandahs or pergolas.
Technical Clearance Requirements for Lightweight Structures and Building Over
Where a proposed structure lies within an easement corridor containing a gravity sewer main, SA Water applies specific engineering limits under TS 0136 Pipework Access and Protection (Version 2.0, 20 March 2023; always check the current version on the SA Water website). Lightweight structures are structures detached from the main building that can be readily dismantled and removed at any time, for example Colorbond sheds, framed patios or carports, and decking. For a gravity sewer, approval of a lightweight structure generally requires:
Demountability: The structure must be easily demountable and able to be dismantled and removed when SA Water requests it; for pressurised pipelines, lightweight structures must not be placed within the zone of influence of the pipeline trench.
Vertical clearance: At least 750 mm between the top of the pipe and the footing.
Horizontal clearance: At least 1000 mm between the pipe wall and the footing.
SA Water’s fact sheet sets further design conditions: the length of an encroachment along an easement is limited to 6.5 metres, and structures over a wastewater main must be easily demountable (non-masonry). The fact sheet also sets horizontal clearances from the centre of the main for different structure types (for example 1.0 m for easily demountable structures not over the main and 1.5 m for masonry-type structures), which is measured differently from TS 0136; the specific requirement should be confirmed in SA Water’s response to your application.
For walls and fences, TS 0136 treats the following as lightweight walls and fences: timber, metal or concrete fibre fences up to 1.8 m high; mass walls of brick, stone or concrete up to 1.8 m high; noise attenuation walls up to 1.8 m high; and retaining walls up to 1.2 m high. Walls and fences crossing a pipe should cross at 90 degrees where possible (and not less than 45 degrees), keep at least 750 mm vertical clearance between the top of the pipe and any footing, and not be built directly over maintenance structure covers. Walls and fences running parallel to a pipe must not be placed within the building exclusion zone.
For permanent structures beyond the lightweight category, TS 0136 requires that the building be outside the building exclusion zone (a width of 1200 mm plus the pipe’s external diameter, from ground level to 300 mm below the pipe invert), and that the structure be self-supporting within the trench’s zone of influence, commonly by piles extending below the zone of influence or to stable rock. The specific design should follow the calculations of a registered structural engineer and SA Water’s case-by-case assessment.
Approval Process, Legal Arrangements and Council Planning Coordination
Approval for building over an easement runs alongside the building application lodged with council: where there is an SA Water easement on the land and building work is proposed, the applicant must give SA Water the building plan drawings, the Certificate of Title and a Building Plan Application at the same time as lodging with council (even if the proposal does not encroach on the easement), and SA Water’s written approval must be obtained before building work starts. If council requires changes to the original plan, SA Water should be told. SA Water generally responds in writing within 10 business days, at no charge. The practical application path generally includes the following steps:
Site survey and asset information: A licensed surveyor establishes the easement boundaries and the location of maintenance structures; for the position, alignment and depth of SA Water pipes, contact SA Water (1300 884 037) and do not access the pipes yourself. If potholing is genuinely needed to locate an asset, the method should be agreed with SA Water beforehand (TS 0136, section 14 sets out the relevant procedures).
Structural design: A professional engineer prepares a structural design that meets the requirements for controlling settlement and separating loads from the pipe.
Application to SA Water: Email the Building Plan Application form, building plans, Certificate of Title and site plan to bpa@sawater.com.au so SA Water can assess whether the asset protection measures are adequate.
Written approval and its consequences: An approved encroachment does not diminish SA Water’s rights over the easement, and may be removed if required and will then be reinstated. An unapproved encroachment, or property improvement that does not meet relevant building and engineering standards, may be removed at the owner’s cost and will not be reinstated. SA Water requires free, unrestricted access to the easement, and will endeavour to give a minimum of 2 days’ notice for planned work. Approved encroachments are recorded against the property account as an encumbrance letter, which a licensed conveyancer can request on a sale.
Where the easement on the land is a Council Stormwater Easement, approval rests with the local council, and its technical clearances and approval requirements should be raised directly with the council’s engineering department.
Sources
About the author
Lin Yuan
Expert property development and project management insights.
Not Sure Whether Your Site Stacks Up?
Send us the address and your goal. We will identify the first planning, buildability and feasibility questions before you commit further capital.