Statutory Warranties in SA: What Transfers When It Sells
This article is general information for South Australian landowners and developers and is not legal advice. Please confirm how any particular contract applies with your own lawyer.
If you are about to hand over a house you built to sell, or are about to sign a contract to sell it to a buyer after completion, the real question is this: does the builder’s promise about the quality of the work travel with the house to your buyer, or does it stay between you and the builder? South Australian law’s answer is that six warranties are implied into every domestic building work contract, and the rights under those warranties pass to each later owner of the house (Building Work Contractors Act 1995, section 32).
This matters most for build-to-sell projects: infill developments, dual occupancies, townhouse subdivisions, or any project where the party signing the building contract is not the long-term holder of the house. What follows is based on the current text of section 32 of the Act, for you to check before handover or listing.
The six warranties implied into every contract
Section 32 provides that the following warranties are implied in every domestic building work contract entered into on or after 22 January 1987. Section 32 itself has no dollar threshold; the threshold sits in a separate, narrower requirement, building indemnity insurance, in Part 5, Division 3 of the Act, whose application is set out separately. The six implied warranties are:
the work will be performed in a proper manner to accepted trade standards and in accordance with the plans and specifications agreed by the parties;
all materials supplied by the contractor will be good and proper;
the work will be performed in accordance with all statutory requirements (building rules, approvals and so on);
if the contract does not set a completion period, the work will be performed with reasonable diligence;
if the work is the construction of a house, the house will be reasonably fit for human habitation;
if the building owner has expressly made known the particular purpose for which the work is required, or the result the owner wants to achieve, so as to show reliance on the contractor’s skill and judgment, the work and materials will be reasonably fit for that purpose.
Example (hypothetical). Suppose a developer engages a builder to build a three-townhouse subdivision, intending to sell each one after completion. The contract between developer and builder will generally be a domestic building work contract, so the six warranties are implied once the contract is made. According to the Law Handbook, a contract cannot exclude the operation of the Act (section 42), so however the contract deals with quality or defects, the warranties are not removed by it.
Warranty rights are not limited to the first owner
This is the key point for build-to-sell projects. A buyer typically obtains warranty rights in one of two ways:
The developer engages a licensed builder, then sells the house to a buyer. The developer is the building owner under the building contract, and the buyer, as purchaser, succeeds to the rights of the predecessor in title (the developer) under the statutory warranties (section 32(3)). Likewise, if the house is later resold, the new owner succeeds to the previous owner’s rights and does not need to be a party to the original building contract.
The developer is itself the building work contractor that performed the work, and the buyer purchases directly from it. The buyer has rights under the statutory warranties under section 32(4), as if the house had been purchased from a third party for whom the vendor had performed the work under a contract subject to those warranties.
In both cases the buyer does not need to be a party to the original building contract, and the right is given by law, regardless of whether your sale contract expressly grants it. In the second case, the buyer’s statutory warranty rights are the same as if they had commissioned the house themselves.
Time limit: five years, and it cannot be extended
Proceedings for breach of a statutory warranty must be commenced within five years after completion of the building work (section 32(5)), and that period may not be extended (section 32(6)). The five years run from completion of the work itself, not from the date of settlement. So if you buy a house that settles eighteen months after completion, your own window is correspondingly shorter, and it does not restart at settlement.
For a developer who sells shortly after completion, the fixed period is not long in itself, but it runs within the same fixed window as the house passes to each later owner. It does not restart or extend when title changes hands.
A real defence, but one that does little for most sellers
The law gives a building work contractor one specific defence: if the contractor can show that a defect results from an instruction that the building owner insisted on, contrary to the contractor’s written advice, the contractor may rely on that as a defence. In general terms, the defence protects a builder who warned the client in writing about a particular instruction and was still told to proceed; it does not help with defects that were never raised, were not recorded in writing, or came purely from the builder’s own workmanship or material choices. If you are a developer who gives variation instructions during construction, keep written records. If you are buying a completed house, it is also worth asking whether any instruction was insisted on contrary to written advice.
Pre-handover and pre-listing checklist
Before you sign as buyer or seller, or before you hand a developer-built house to a buyer, check:
Confirm the completion date in writing. The five-year period runs from here, not from your settlement date. Put it on the record rather than relying on memory.
Collect the plans and specifications referred to in the contract. The first warranty is measured against them; without agreed plans and specifications, it is hard to say what “proper manner” means for the work.
Ask whether any instruction was insisted on contrary to the builder’s written advice. If you are a buyer, this helps you understand whether you may inherit the related defence risk; if you are a developer, these records should already be in your project file.
Keep the chain-of-title documents complete. Because warranty rights pass automatically on resale, a clear record of who owned the house and when supports a future claim far better than relying on the statutory right alone.
Do not confuse it with building indemnity insurance. The statutory warranty is a promise implied into the contract itself; the same Act also has a separate, narrower insurance requirement, aimed at situations where the builder becomes insolvent, dies or disappears before the work (or a warranty claim) is resolved. The mechanism and the triggers are different, and each is worth confirming separately with an insurer or broker before you rely on either.
None of this replaces reading your own contract, or taking legal advice on a specific defect or transaction. The provisions above work the same way for every South Australian domestic building work contract, but how they apply to your project depends on your actual contract terms, your actual completion date and the records you have kept.
Where this article sits in the build process
Statutory warranty sits at the handover end, while the full process usually starts with comparing builder quotes and understanding provisional sums and prime cost items, runs through the construction phase, and includes the protections discussed in our articles on what to do if your builder goes into liquidation mid-build, and on what leverage you still have after a builder is signed. If your project is still at an early stage, our guide to the South Australian property development process is a useful overall reference.
If you are weighing handover, sale, or a defect that has appeared after settlement, it is worth talking to a development manager before you take a position: book a free consultation.
Sources
About the author
Cyberate PM
Expert property development and project management insights.